Conversion of two subletting areas of the Boston Consulting Group within an existing building in Munich, Germany.
GFA ca. 1,300 m²
Fit Out costs ca. 700,000 €
Services: detail design under consideration of and in extension to the existing fire prevention system, the access- and security concept, and the materials of the existing building. Tender documents for all trades, including security system and HVAC components, supervision while operation.